Notice: Undefined index: secID in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 9

Warning: include_once(/newsCentre/captcha.php): failed to open stream: No such file or directory in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 25

Warning: include_once(): Failed opening '/newsCentre/captcha.php' for inclusion (include_path='.:/usr/share/php') in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 25

Notice: Undefined index: secID in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 49

Notice: Undefined variable: storySecID in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 57

Warning: count(): Parameter must be an array or an object that implements Countable in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 223

Warning: include_once(./functions/secwiseNewsFunctions.php): failed to open stream: No such file or directory in /me/beta.myiris.com/htdocs/newsCentre/bodyTop.php on line 5

Warning: include_once(): Failed opening './functions/secwiseNewsFunctions.php' for inclusion (include_path='.:/usr/share/php') in /me/beta.myiris.com/htdocs/newsCentre/bodyTop.php on line 5
Live news , top stories, corporate news, company news, sector news, economy news, results analysis news, ceo interviews, fund manager interview, advisor interview, market news, bazaar talk, hot stocks news, ipo news, commodities news, mutual fund news, insurance news, news wire
11 May, 2025 15:23 IST
Tata Power Solar gets EPC orders worth Rs 5,380 mn from EESL
Source: IRIS | 12 Oct, 2021, 08.12PM
Rating: NAN / 5 stars.
Comments  |  Post Comment

Notice: Undefined variable: fileR in /me/beta.myiris.com/htdocs/newsCentre/bin/addLinksNew.php on line 17

Notice: Undefined variable: fileR in /me/beta.myiris.com/htdocs/newsCentre/bin/addLinksNew.php on line 142


Tata Power Solar Systems (Tata Power Solar), one of India’s largest integrated solar company and a wholly-owned subsidiary of Tata Power, has received "Letter of Award" (LoA) to build 100 MW of Distributed Ground Mounted Solar projects for Energy Efficiency Services (EESL). The total order value of projects is Rs 5,380 million. The commissioning date of the projects is set for 12 months.

With this win, the Utility Scale EPC order book of Tata Power Solar now stands at ~4GW (DC) capacity with an approximate value of Rs 92,640 million (without GST), thereby strengthening its position as India’s leading Solar EPC player.

The EESL project sites are located in Maharashtra. The work secured includes engineering, design, supply, construction, erection, testing, O&M and commissioning of the solar projects.

Praveer Sinha, CEO & MD, Tata Power said, "We are enthused with the new contract win from EESL for Distributed Ground Mounted Solar EPC projects. This is yet another recognition of Tata Power's strong credentials in the solar energy domain and project execution capabilities."

Shares of the company gained Rs 4.25, or 2.22%, to settle  at  Rs 195.80.  The total volume of shares traded  was  11,176,851 at  the BSE (Tuesday).




 Post Comment
Notice: Undefined index: dir in /me/beta.myiris.com/htdocs/newsCentre/comments.php on line 162
>
Name Email
Comment
Security Code type   
Notice: Undefined variable: captchacode in /me/beta.myiris.com/htdocs/newsCentre/comments.php on line 183
into this box
Related Articles

Notice: Constant DOC_ROOT_FOR_HTML_FILES already defined in /me/beta.myiris.com/htdocs/newsCentre/rightSideTabs.php on line 1

Notice: Undefined index: secID in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 470

Notice: Undefined index: secID in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 470
Home  |   Shares  |   F&O  |   Mutual Funds  |   Loans  |   Insurance  |   News Centre
Wealth Tracker  |   Newsletters  |   Tax Corner  |   NRI Centre  |   Advertise
© All rights reserved. IRIS Business Services Limited
A Disclaimer


Warning: fopen(/me/beta.myiris.com/htdocs/newsCentre/news_web_count.txt): failed to open stream: Permission denied in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 566

Warning: fwrite() expects parameter 1 to be resource, boolean given in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 567

Warning: fclose() expects parameter 1 to be resource, boolean given in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 568

Notice: Undefined index: key in /me/beta.myiris.com/htdocs/newsCentre/storyShow.php on line 571