Live news , top stories, corporate news, company news, sector news, economy news, results analysis news, ceo interviews, fund manager interview, advisor interview, market news, bazaar talk, hot stocks news, ipo news, commodities news, mutual fund news, insurance news, news wire
20 April, 2024 17:16 IST
SJVN climbs after commissioning of Rampur power project
Source: IRIS | 08 Dec, 2014, 10.31AM
Rating: NAN / 5 stars.
Comments  |  Post Comment

SJVN, operator of hydro-electric power projects, witnessed a rise in share price on Monday after it announced that the 412 MW Rampur Power Project of the company has commissioned the work. The 412 MW Rampur Power Project of the company, located on river Satluj in Himachal Pradesh stands fully commissioned on Dec. 04, 2014 with the commissioning of the last i.e. 6th vertical axis Francis turbine Unit of 412 MW Rampur Power Project.

Shares of SJVN  are trading at Rs 25.20, up Rs 0.5, or 2.02%  at the Bombay Stock Exchange (BSE) on Monday at 10:14 a.m. The scrip has touched an intra-day high of Rs 25.45 and low of Rs 24.85. The total volume of shares traded at the BSE is 141,273.

 Post Comment
Name Email
Comment
Security Code type    into this box
Related Articles
Home  |   Shares  |   F&O  |   Mutual Funds  |   Loans  |   Insurance  |   News Centre
Wealth Tracker  |   Newsletters  |   Tax Corner  |   NRI Centre  |   Advertise
© All rights reserved. IRIS Business Services Limited
A Disclaimer