Live news , top stories, corporate news, company news, sector news, economy news, results analysis news, ceo interviews, fund manager interview, advisor interview, market news, bazaar talk, hot stocks news, ipo news, commodities news, mutual fund news, insurance news, news wire
19 April, 2024 17:39 IST
BHEL commissions all 4 Hydro sets of 82.5 MW each at 330 MW Hydro Power Station
Source: IRIS | 11 Jun, 2015, 02.39PM
Rating: NAN / 5 stars.
Comments  |  Post Comment

Bharat Heavy Electricals (BHEL), an integrated power plant equipment manufacturer, has commissioned the 330 MW Shrinagar Hydro Electric Project (HEP) in Uttarakhand.

Significantly, all the four units of this project have been commissioned in quick succession within a span of just 60 days.

Shares of the company declined Rs 8.05, or 3.2%, to trade at Rs 243.35. The total volume of shares traded was 261,338 at the BSE (2.36 p.m., Thursday).

 Post Comment
Name Email
Comment
Security Code type    into this box
Related Articles
Home  |   Shares  |   F&O  |   Mutual Funds  |   Loans  |   Insurance  |   News Centre
Wealth Tracker  |   Newsletters  |   Tax Corner  |   NRI Centre  |   Advertise
© All rights reserved. IRIS Business Services Limited
A Disclaimer